2002 Frieghtliner FL70 asphalt sealcoating truck
For Sale by Auction in Missouri
2002 Frieghtliner FL70 asphalt sealcoating truck
Title distribution may be delayed up to 14 days from verification of funds.
- Miles: 258,843 on odometer
- Hours: 3,192 on meter
- VIN: 1FVABTAK62HJ94607
- Caterpillar 3126
- Displacement: 7.2L
- Cylinders: 6
- Fuel type: Diesel
- HP: 330
- Allison
- Automatic
- Axles: Single
- Suspension: Spring
- Brakes: Air
- GVWR: 33,000 lbs
- AC, heat
- Heated mirrors
- Cruise control
- Bed / tank
- Dimensions: 12' L x 64" W
- Overall bed width: 96"
- Neyra
- Capacity: 2,000 gallons
- Spray wand
- Hydraulic driven agitator
- Air operated diaphragm pump
- Wilden
- Width: 2"
- 8' aluminum spray wand
- 70' hose
- Briggs and Stratton gas engine
- Cylinders: 2
- Air Compressor
- Ingersoll-Rand M/M 2475F14G
- Kohler Command PRO gas engine
- Cylinders: 1
- HP: 14
- Air tank
- Capacity: 30 gallons
- Size: 295/75R22.5
- Dash warning indicator: Check engine
Title distribution may be delayed up to 14 days from verification of funds.
2002 Frieghtliner FL70 asphalt sealcoating truck Item Details
Description
2002 Frieghtliner FL70 asphalt sealcoating truck
- Miles: 258,843 on odometer
- Hours: 3,192 on meter
- VIN: 1FVABTAK62HJ94607
Engine
- Caterpillar 3126
- Displacement: 7.2L
- Cylinders: 6
- Fuel type: Diesel
- HP: 330
Transmission
- Allison
- Automatic
Chassis
- Axles: Single
- Suspension: Spring
- Brakes: Air
- GVWR: 33,000 lbs
Interior
- AC, heat
- Heated mirrors
- Cruise control
Features
- Bed / tank
- Dimensions: 12′ L x 64″ W
- Overall bed width: 96″
- Neyra
- Capacity: 2,000 gallons
- Spray wand
- Hydraulic driven agitator
- Air operated diaphragm pump
- Wilden
- Width: 2″
- 8′ aluminum spray wand
- 70′ hose
- Briggs and Stratton gas engine
- Cylinders: 2
- Air Compressor
- Ingersoll-Rand M/M 2475F14G
- Kohler Command PRO gas engine
- Cylinders: 1
- HP: 14
- Air tank
- Capacity: 30 gallons
Tires
- Size: 295/75R22.5
Notes
- Dash warning indicator: Check engine
Missouri title
Title distribution may be delayed up to 14 days from verification of funds.